Broadway Bridge to close for 6 months starting May 12

Pedestrian access to Meewasin Trail will be maintained beneath the construction

CBC NewsChris Edwards

The Broadway Bridge in Saskatoon will be closed for repairs for six months, starting May 12, 2025. 

The city says the 93-year-old bridge needs major rehabilitation, including new asphalt, waterproofing and deck repairs. Old and abandoned utilities currently sitting underneath the bridge will also be removed.

The entire bridge will be closed during that time, including the multi-use pathways running along both sides. 

"If we do a full closure of the bridge, the contractor can operate much more effi…

Continued...

Read the full story on the CBC website

Broadway Bridge to close for 6 months starting May 12

SOURCE www.cbc.ca

Posted by
Share your news and events for free on lokol Saskatoon
SHOW ME HOW


2
https://saskatoon.lokol.me/s/broadway-bridge-to-close-for-6-months-starting-may-12-55764-10278554
CBC NewsChris Edwards, Posted: May 01, 2025 10:37 AM EDT | Last Updated: 27 minutes ago
Living News From Local Media

0

Log In or Sign Up to add a comment.
Depth
seek-warrow-w
  • 1
arrow-eseek-eNo items to display
View all the LATEST
and HOTTEST posts
View

Share this comment by copying the direct link.

  • Our
    Sponsors

Using this website is subject to the Terms of Use that contain binding contractual terms.